Notice: Uninitialized string offset: 0 in /home/gkgpmc.com/public_html/wp-includes/class-wp-theme.php on line 1

Notice: Uninitialized string offset: 0 in /home/gkgpmc.com/public_html/wp-includes/class-wp-theme.php on line 1

Notice: Uninitialized string offset: 0 in /home/gkgpmc.com/public_html/wp-includes/template.php on line 1

Notice: Uninitialized string offset: 0 in /home/gkgpmc.com/public_html/wp-includes/template.php on line 1

Notice: Uninitialized string offset: 0 in /home/gkgpmc.com/public_html/wp-includes/html-api/class-wp-html-decoder.php on line 1

Notice: Uninitialized string offset: 0 in /home/gkgpmc.com/public_html/wp-includes/html-api/class-wp-html-decoder.php on line 1

Notice: Uninitialized string offset: 0 in /home/gkgpmc.com/public_html/wp-includes/class-wp-application-passwords.php on line 1

Notice: Uninitialized string offset: 0 in /home/gkgpmc.com/public_html/wp-includes/class-wp-application-passwords.php on line 1
GKG

Case study

Home / Case study

Project Management For rail connectivity work ICTT-Vallarpadom – Ernakulam – Kerala

Project management Consultant for Rail Vikas Nigam (RVNL) for rail connectivity work to Vallarpadom international container transhipment terminal , which also has the longest railways bridge in India . 

Services provided:

  • Preparation of Alignment drawings, sectional drawings and working drawings including Final railway alignment.
  • Preparation of detailed estimates for this work
  • Preparation of variation statements
  • Preparation of working plan, working section etc
  • Preparation of working plans
  • Preparation of earth work cross section
  • Total supervision for supervision of the Project