Notice: Uninitialized string offset: 0 in /home/gkgpmc.com/public_html/wp-includes/class-wp-theme.php on line 1

Notice: Uninitialized string offset: 0 in /home/gkgpmc.com/public_html/wp-includes/class-wp-theme.php on line 1

Notice: Uninitialized string offset: 0 in /home/gkgpmc.com/public_html/wp-includes/template.php on line 1

Notice: Uninitialized string offset: 0 in /home/gkgpmc.com/public_html/wp-includes/template.php on line 1

Notice: Uninitialized string offset: 0 in /home/gkgpmc.com/public_html/wp-includes/html-api/class-wp-html-decoder.php on line 1

Notice: Uninitialized string offset: 0 in /home/gkgpmc.com/public_html/wp-includes/html-api/class-wp-html-decoder.php on line 1

Notice: Uninitialized string offset: 0 in /home/gkgpmc.com/public_html/wp-includes/class-wp-application-passwords.php on line 1

Notice: Uninitialized string offset: 0 in /home/gkgpmc.com/public_html/wp-includes/class-wp-application-passwords.php on line 1
GKG

Case study

Home / Case study

Preliminary study and preparation of Feasibility Report (FR) for the Full gantry length Tank wagon loading Railway siding at Bharath Petroleum Corporation Limited, Irumpanam, Ernakulam, Kerala in association with BARSYL

Services provided:

  • Topographic survey of the Irumpanam Railway yard and BPCL loading area
  • Preparation of track siding alignment including new tracks and gantry position
  • Preparation of abstract estimate, yard and gantry drawings

Preparation and submission of feasibility report and getting the same approved by Southern Railway.