Notice: Uninitialized string offset: 0 in /home/gkgpmc.com/public_html/wp-includes/class-wp-theme.php on line 1

Notice: Uninitialized string offset: 0 in /home/gkgpmc.com/public_html/wp-includes/class-wp-theme.php on line 1

Notice: Uninitialized string offset: 0 in /home/gkgpmc.com/public_html/wp-includes/template.php on line 1

Notice: Uninitialized string offset: 0 in /home/gkgpmc.com/public_html/wp-includes/template.php on line 1

Notice: Uninitialized string offset: 0 in /home/gkgpmc.com/public_html/wp-includes/html-api/class-wp-html-decoder.php on line 1

Notice: Uninitialized string offset: 0 in /home/gkgpmc.com/public_html/wp-includes/html-api/class-wp-html-decoder.php on line 1

Notice: Uninitialized string offset: 0 in /home/gkgpmc.com/public_html/wp-includes/class-wp-application-passwords.php on line 1

Notice: Uninitialized string offset: 0 in /home/gkgpmc.com/public_html/wp-includes/class-wp-application-passwords.php on line 1
GKG

Case study

Home / Case study

Detailed Design Consultancy (DDC) for a new Single line

Detailed Design Consultancy (DDC) for construction of a new Single line BG Railway Line project from Sivok to Rangpo, West Bengal, India by IRCON. In association with M/s D2 Austria +PEMS consultants, New Delhi (JV).

Services provided:

  • Study the alignment submitted to the client IRCON by previous consultants
  • Site inspection of the bridge and collection of data for the preliminary design of bridges and yards.
  • Make preliminary design calculations for the bridge with latest loading and as per the existing Bridge and IS codes.
  • Prepare the yard drawings and present the same to NR Railway for finalization.
  • Submit the inception report and get it approved by the client.