Consultancy services for the proposed connectivity to Vizhinjam; preparation of DPR with Tunnel from Balaramapuram to Vizhinjam and Yard at Balaramapuram.
Services provided:
- Prepare the Railway aligment from new Port at Vizhinjam to Balaramapuram (15 kms)
- Plan the Railway siding inside the new port at Vizhinjam
- Plan the R& D lines and yard modifications required at Balaramapuram and connect the same to the existing Railway network
- Plan the PORT and related facilities
- Make the costing of the project and prepare the DPR